Multiple Wide, High-Grade Intercepts at the CV5 Pegmatite, including 153.8 m at 2.00% Li2O, Completes Drill Dataset for Upcoming Feasibility Study and Ore Reserve in Q3-2025

Highlights Wide, high-grade spodumene pegmatite intercepts received from the extensive summer-fall 2024 in-fill drill program at CV5 complete the drill dataset required to support the upcoming Feasibility Study and maiden Ore Reserve: 153.8 m at 2.00% Li2O, including 55.4 m at 3.42% Li2O (CV24-733). 142.9 m at 1.77% Li2O, including 35.2 m at 3.36% Li2O […]